How to fix a greenhouse when building it

The assembled greenhouse frame is formed by bending ms pipe (galvanized steel pipes or polychlorinated steel pipes), arches, longitudinal rods, membrane grooves, membrane springs, side ventilation devices, etc., assembled by various galvanized stampings. . The single arch of the greenhouse arch is made up of two curved galvanized steel pipes or polychlorinated steel pipes at the top and connected by the inner tube; the double arch of the large arch is made up of: 4 curved galvanized steel pipes or polychlorinated steel pipes. It is connected by a connecting card and is connected to the top by an inner tube, and one arch is used per 1 meter. The longitudinal rod is made of galvanized pipe or polychlorinated steel pipe, which is connected by a pull rod pin, and the arched rod is fixed by a cross plate or a compression spring. The two longitudinal film grooves of the greenhouse are fixed on the arches with drill tail nails, and the film is fixed by a snap spring.
Installation step:
First, the base of the east and west strips is 50 cm high, and the middle to middle spacing is 1 m. After that, a layer of bricks is placed on the floor. The steel bars are placed on the top, and then the total height is 70 cm. Then the greenhouse arch is installed. Rack, erect 3-5 arches, pull up the longitudinal bar, then erect the arches in turn, and then pull each of the escapement bars. After the skeleton is completely installed, fill the holes with concrete, the upper number, and then the two sides of the gable After 24 hours, the concrete is solidified, the upper card slot is circlip, then the film is buckled, the straw is covered, the felt is covered, and the covering material is completely completed. The film is wound on the upper side and the film is wound up to complete the installation.

Most Recent Entries

gi pipe
gi pipe
gi pipe
gi pipe
gi pipe

Contact us